Beans Construction Co
DEQ roster matchChoctaw, OK
Department of Environmental Quality septage pumpers with a Choctaw, Oklahoma mailing city. Use this page to start calls about residential pumping, emergency questions, or portable-toilet honesty. A mailing city is not a promise to cover every address.
Call and confirm they pump at your street. Some names are portable-toilet haulers.
Choctaw, OK
Choctaw, OK
Choctaw, OK
This page lists Department of Environmental Quality septage pumper records that use Choctaw, Oklahoma as the mailing city. Counted on 23 October 2026 from the 231 listing cards on the companies hub, the directory has 36 Central Oklahoma records, 22 Tulsa-area records, 145 in the rest of Oklahoma, and 28 with an Oklahoma-licensed, out-of-state mailing address. Three of those records use Choctaw as the mailing city. Homeowners in Choctaw and the rest of Central Oklahoma usually need a routine pump-out, help after a backup, or a clear answer about portable-toilet versus house-tank work — confirm the exact job when you call.
Oklahoma city names on this directory are roster locations, not service-area promises. A company based in another city may or may not drive to Choctaw. Ask about your street, tank type, and timing before you treat a card as a match.
This site does not book the job and does not invent emails, streets, or star ratings. Sister site Oklahoma Aerobic Guide is for aerobic installers. If you need the tank emptied, stay on this list.
Questions that track DEQ Chapter 645 pumper duties are on what to ask before you book; a mailing city on this list is still not a coverage promise.
The City of Choctaw Mapping Division says: “The Mapping Division creates and maintains the Geographic Interface System (G.I.S.) Mapping Program.” The same page says the division updates information on the City’s sanitary sewer system and water system. Ask the Mapping Division whether that map shows a sanitary sewer at the address before you assume the lot is on a septic tank.
The page says: “The Mapping Division can provide a representation of the utility locations.” The Mapping Division phone printed on that page is (405) 390-2999. That number is the City office.
The City’s disclaimer says: “Let it be known that the Mapping Division and the City of Choctaw does not take the responsibility for the accuracy of its maps. The City is not responsible for the accuracy of the mapped features. To confirm the locations, it is the applicant's responsibility to confirm the exact location of utilities.” The map on the same page adds: “This data was created solely as a representation use by the City of Choctaw, Oklahoma. The City of Choctaw, Oklahoma assumes no responsibility for the content or accuracy of this map.” Confirm the address with the City before you treat a map line as a connection.
The page footer lists the City of Choctaw at PO Box 567, 2500 N. Choctaw Rd., Choctaw, OK 73020, phone (405) 390-8198. That number is the City.
The same footer lists “Water/Sewer Emergencies after 5 pm” with (405) 520-8911 and (405) 520-8912. Those numbers are the City’s water and sewer emergency lines. The page lists the numbers and does not give a response time.
A backup in a private septic tank is a different call. Use the three Choctaw mailing-city cards on this page and ask whether they pump a house tank at your street. A mailing city is not a coverage promise.
Installing a new system or modifying an existing one follows the Oklahoma Department of Environmental Quality steps on the on-site sewage treatment page. The page states statewide DEQ rules for on-site sewage treatment.
DEQ says: “Before installing a new or modifying an existing on-site sewage treatment system, an Authorization to Construct (ATC) must be purchased and issued by DEQ.” The Report for On-Site Sewage (581) must be reviewed by DEQ before the ATC may be issued. After the ATC is purchased, it is assigned to the local DEQ Environmental Specialist, based on the location of the property, for review and issuance.
DEQ says: “All new installations or modifications to an on-site sewage system must be inspected and approved by DEQ or installed, self-inspected and approved by a certified installer before the system may be placed into operation.” Final inspections are documented on DEQ Form 641-576. The page says: “The information provided must clearly identify all system components, their location on the property, and minimum required separation distances per Chapter 641.” It also says: “Final inspections performed by a certified installer must be submitted to DEQ within 15 days of completion.”
Effective November 1, 2025, DEQ says individuals not certified through DEQ may only install one on-site sewage treatment system per calendar year.
On maintenance, the page says: “When an on-site system is properly designed, installed, and maintained, it serves as an effective and economic treatment system. More times than not, however, the on-site system is installed and forgotten. Maintenance is the homeowner’s responsibility and is the key to avoid system malfunctions and possible costly repairs.” The page says: “The type and frequency of maintenance required for your on-site system depends on the type of system.” The first step it names is to know the type of system that serves the home or business. If you are still unsure, the page says to contact your local DEQ office at (405) 702-6100. That number is DEQ. The page does not give a pump-out interval.
On the 23 October 2026 recount, three records use a Choctaw mailing city. Beans Construction Co, 405-769-3945. Johnson Construction, 405-769-6071. Willco Septic, 405-760-8562. Each card carries residential, conventional, and aerobic-tank directory tags. Call and confirm they pump at your street.
For the Oklahoma City mailing-city list, see septic pumping in Oklahoma City.